Skip to content

Product range · Confirm the exact supplied model in your quotation.

CHINT / Breakers & protection

CHINT NS2 Manual Motor Starter

Motor protection and manual switching for pumps, fans and industrial motor circuits.

25 / 32 / 80A framesProduct range
  • Manual motor control
  • Adjustable motor overload selection
  • Industrial pump and fan circuits
Request a quotePrice & availability confirmed by our team

Selections describe your requirements. Our team confirms the exact available part number and compatible combination.

Your enquiry opens in WhatsApp for you to review and send.

Model selectionInstallation optionsAfter-sales assistance

THE DETAILS

About this equipment

Sunlight can review the circuit design, fault level and required accessories before identifying the exact part number in your quotation. Ratings shown describe a range; not every combination is offered. Share the motor’s rated voltage, phase, full-load current and starting arrangement for selection.

Specifications & selection details

CHINT NS2 Manual Motor Starter details
SeriesNS2
Frame familiesNS2-25, NS2-32 and NS2-80 variants
ProtectionMotor overload, short-circuit and phase-failure functions, model dependent
SelectionAdjustable current band must match motor nameplate current
Insulation voltage690V
Frequency50/60Hz
Trip class10A in the manufacturer catalogue for listed variants
StandardsIEC/EN 60947-2 and IEC 60947-4-1
Ambient reference−5°C to +40°C; 24-hour average ≤35°C
Impulse withstand8kV
Pictured modelNS2-25, 0.4–0.63A; other current bands differ
Visit the manufacturer for product documentation ↗

Manufacturer information checked 3 November 2026. Model and regional variants may differ. Your written quotation identifies the equipment offered, with its applicable datasheet and terms.

Ordering & support

01

Share your requirements

Tell us your city, quantity and whether you need supply only or installation.

02

Review your quotation

Confirm the exact model, price, availability, accessories and agreed work before ordering.

03

Confirm the support terms

Review product warranty documents and the installation and after-sales responsibilities.

Is this product available for immediate delivery?

Our team confirms current stock, supply arrangements and any delivery charges in your quotation.

Is installation included in the price?

Equipment supply, installation, protection and accessories are separate scope items unless your quotation explicitly includes them.

How do I check compatibility?

Share the model numbers of your existing equipment and your intended load. We will review the proposed combination before confirming the selection.

OUR PRESENCE

Our Offices

Visit our Karachi Head Office. More locations are coming soon.
Head Office

Karachi

Suite D-02, 4th Floor, Descon Plaza,
Main Shahra-e-Faisal, Karachi.

Get directions
Coming soon

Islamabad Office

Address and opening details will be announced here.

Coming soon

Lahore Office

Address and opening details will be announced here.

Coming soon

Hyderabad Office

Address and opening details will be announced here.

Karachi Head OfficeSuite D-02, 4th Floor, Descon Plaza, Main Shahra-e-Faisal, Karachi.
Get directions